Cherished dreams, blissful mornings, laughter and memories. Shades of bliss overwhelm your shine. Every hue comes with its cue. Where violet brings happiness, indigo brings wealth. Where blue brings health, green brings prosperity. Yellow brings luxury while red brings love. Hues can bring out the best in you. Own a home to celebrate life in the best of its colours. Myriad hues are here for you.
Specifications
Structure |
Earthquake resistant RCC framed structure with external brick/block walls. |
Wall-Finish |
Internal: Internal walls in cement plaster with POP punning with plastic emulsion paint or texture finish. |
External: Combination of stone, tiles, Acrylic emulsion/Texture Paint. |
Flooring/wall Dado |
Drawing Room, Living, Dining: Italian/Spanish vitrified tiles or equivalent quality with designer patterns. |
Bedrooms: Virtified tiles/High quality wooden laminate flooring. |
Study room |
Vitrified tiles/ High quality wooden laminate flooring. |
Balcony |
High quality anti skid ceramic tiles. |
Servant Room/study: Kitchen counter with high quality granite/imported marble, floor and wall dado with high quality ceramic tiles. |
Toilets |
Imported beige Spanish tiles or equivalent flooring. Spanish tiles in walls till ceiling height for the master toilet. All other toilets will have high quality imported ceramic floor and wall tiles up to 7 ft. height, balance painted in acrylic emulsion paint. |
Kitchen |
Imported fittings of Kohler or equivalent. Double bowl stainless steel sink with drain board. Designer/modular woodwork & fittings. |
Provisions for piped gas supply & R.O. system. |
Doors & Windows |
Main Entrance: Elegantly designed and finished 8 feet high entrance door with polished hardwood frame having European style moulded shutter with high quality imported/Indian hardware fittings. |
Electrical Fitting: Seasoned hardwood frame with European style moulded shutters. |
Walls: Branded UPVC windows. |
Toilets |
Premium quality imported sanitary/high class wall hung W.C. and washbasin in matching shades/colors. Single lever C.P. Fittings Kohler/Jaquar or equivalent. All the toilets will include exhaust fan, mirror, towel rack, rod & ring accessories. Master toilet will have glazed shower enclosure. |
Others |
Branded split air conditioners in the master bedroom and living room. Modular wardrobes/cupboards in all the bedrooms. |
Electricals |
Modular range switches/ sockets (Legrand or equivalent)/MCBs, copper wiring. Two wall light fixtures in each of living, dining, lobby and bedrooms area. |
Power backup |
100% power back-up for every apartment. |
Communication |
TV and telephone points, EPABX and video door phone. |
Security |
Secured gated community with access control at entrances with Automatic boom barriers and manual gates at entry and exits of the development. CCTV in basements, ground floor lobbies and main entrance lobby for surveillance. EPABX system linked to each unit. |
Access control cards and video door phone for each apartment. |
[A] Construction Linked Payment Plan (BSP: Rs. 7200; Inaugural Discount: Rs. 200) | |||||
Accommodation Type | Unit Size | Effective Basic Sale Price | Total Price in Rs. | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
2 BHK | 1180 | 109.63 | 7000 | 75320 | 8260000 |
2 BHK + Study | 1430 | 132.85 | 7000 | 75320 | 10010000 |
3 BHK | 1765 | 163.97 | 7000 | 75320 | 12355000 |
[B] Flexi Payment Plan | |||||
Accommodation Type | Unit Size | Basic Sale Price | Total Price in Rs. | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
2 BHK | 1180 | 109.63 | 6700 | 72118.23 | 7906000 |
2 BHK + Study | 1430 | 132.85 | 6700 | 72118.23 | 9581000 |
3 BHK | 1765 | 163.97 | 6700 | 72118.23 | 11825500 |
[C] Possession Payment Plan | |||||
Accommodation Type | Unit Size | Basic Sale Price | Total Price in Rs. | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
2 BHK | 1180 | 109.63 | 6800 | 73194.62 | 8024000 |
2 BHK + Study | 1430 | 132.85 | 6800 | 73194.62 | 9724000 |
3 BHK | 1765 | 163.97 | 6800 | 73194.62 | 12002000 |
[D] Subvention Payment Plan | |||||
Accommodation Type | Unit Size | Basic Sale Price | Total Price in Rs. | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
2 BHK | 1180 | 109.63 | 7200 | 77500.19 | 8496000 |
2 BHK + Study | 1430 | 132.85 | 7200 | 77500.19 | 10296000 |
3 BHK | 1765 | 163.97 | 7200 | 77500.19 | 12708000 |
[E] Other Charges (One Time) | |||||
Particulars | Cost | ||||
Development Charges (DC) | Rs. 350/sq.ft. | ||||
Parking – Covered (1 Mandatory) | Rs. 3,50,000 | ||||
Club Membership | Rs. 1,50,000 | ||||
IFMS | Rs. 100/sq.ft. | ||||
Power Back-up Charges (3 KVA Mandatory) | Rs. 20,000/KVA | ||||
Electricity Installation Charges (3 KVA Mandatory) | Rs. 20,000/KVA | ||||
[F] Preferential Location Charges | |||||
Location | Cost/sq.ft. | ||||
1st to 8thFloor | Rs. 200 | ||||
9th to 16th Floor | Rs. 150 | ||||
17th to 21stFloor | Rs. 100 | ||||
Corner | Rs. 50 | ||||
Park Facing | Rs. 150 | ||||
Club Facing | Rs. 100 | ||||
Payment Plan | |||||
Hues 76 Canvas | |||||
[A] Flexi Payment Plan | |||||
Particulars | Amount / Percentage | ||||
On Booking | Rs. 5,00,000 | ||||
Within 45 days of Booking | 20% less Booking Amount of Total Cost | ||||
Within 90 days of Booking | 20% of Total Cost | ||||
On Completion of Structure of 2nd Floor | 20% of Total Cost | ||||
On Completion of Structure of 15th Floor | 20% of Total Cost | ||||
On Offer of Possession | 20% of Total Cost | ||||
[B] Possession Linked Payment Plan | |||||
Particulars | Amount / Percentage | ||||
On Booking | Rs. 5,00,000 | ||||
Within 60 days of Booking | 20% of less Booking Amount of Total Cost | ||||
Within 120 days of Booking | 20% of Total Cost | ||||
On Completion of Superstructure | 30% of Total Cost | ||||
On Offer of Possession | 30% of Total Cost | ||||
[C] Subvention Payment Plan | |||||
Particulars | Amount / Percentage | ||||
On Booking | Rs. 5,00,000 | ||||
Within 60 days of Booking | 15% of Total Cost less Booking Amount | ||||
Bank Disbursement | 80% of Total Cost | ||||
On Offer of Possession | 5% of Total Cost | ||||
[D] TERMS AND CONDITIONS | |||||
Development Charges (DC) are pro-rated per Unit as applicable to this Group Housing Colony. In case of any revision, the same would be recovered on pro-rata basis from the Applicant/Allottee. | |||||
Service tax as applicable would be payable by the customer as per demand (Basic: 3.09%; PLC, Club Membership & Other Charges: 12.36%) | |||||
Electricity Installation Charges, Maintenance Charges, Meter Connection Charges and other charges extra and shall be collected before the possession. | |||||
Prices subject to revision at the sole direction of the company. | |||||
Cheques/Bank Drafts to be issued in favor of "SUPERTECH LIMITED A/C" payable at New Delhi. Outstation cheques shall not be accepted. | |||||
MEP Services (Mechanical, Electrical & Plumbing Services). | |||||
Timely Payment Rebate is applicable if the customer pays his installments on time till 40% and then Rs. 100 will be credited in his/her unit at the time of possession. | |||||
Progress Status | |||||
Block/Tower | Expected Possession | Current Status (RCC Structure) | |||
Tower-A (2B+P+24) | 7/18/2016 | 10th Floor Lvl col in porgress | |||
Tower-B (2B+P+24) | 7/18/2016 | 10th FloorLvl slab in porgress | |||
C | --- | Excavation work completed | |||
D | --- | Excavation work completed | |||
Tower-E (2B+P+24) | 7/18/2016 | 12th floor col in progress | |||
Tower-F (2B+P+24) | 7/18/2016 | 12th floor slab in progress | |||
Tower-G (2B+P+24) | 7/18/2016 | 3rd floor slab in progress | |||
Tower-H (2B+P+ 24) | 7/18/2016 | 4rd floor col in progress | |||
K | 7/18/2016 | excavation copleted | |||
L | --- | Excavation work completed | |||
Tower-M (2B+P+28) | 7/18/2016 | 6th floor in progress | |||
Tower-N (2B+P+28) | 7/18/2016 | 3nd floor slab in progress | |||
Tower-O (2B+P+28) | 7/18/2016 | Upper Basement slab in progress | |||
Tower-P (2B+P+28) | 7/18/2016 | Raft in Progress | |||
Tower-K (2B+P+28) | 7/18/2016 | PCC in progress | |||
Tower-T (2B+P+28) | 7/18/2016 | PCC in progress | |||
Tower-V (2B+P+28) | 7/18/2016 | Raft in Progress | |||
Tower-W (2B+P+28) | 7/18/2016 | Raft in Progress | |||